Today we show you a residential project optimized to the maximum!
⚡Installed in June, this photovoltaic system produced almost 2 MWh of energy in the two months it worked 🔋
⚡ Due to a very low internal consumption, close to zero, most of the energy generated was injected into the electricity grid.
➡️ Project installed through the “Program regarding the installation of photovoltaic panel systems for the production of electricity, in order to cover the consumption requirement and deliver the surplus to the national network, carried out by AFM and financed from the Environmental Fund”.