Following the installation of the first photovoltaic plant for Sylc Con Trans, the second installation followed in a new location.
The project was a challenging one for the Astra Electric team, but the 864 550W panels were successfully installed.
As always, Huawei inverters and Canadian Solar panels were the equipment we relied on.